Build conduit and wiring without rework

Fix the mechanical and electrical sequence to protect the 270-minute limit.

Mark dimensions first

Confirm reference points and routes before mounting hardware.

Protect wire-pull access

Avoid excessive bends and check continuity through conduit.

60 items · 60 minHands-on · 270 min60 each

Follow terminal numbers

Verify each connection against the diagram rather than colour alone.

Perform pull and tightening checks

Inspect exposed conductor, insulation damage and terminal security.