Practical setup

Read the public task as a work order

Interpret diagrams, dimensions, supplied material and required operation before cutting.

Confirm the latest file

Q-Net notes that public tasks can change, so check the file date and session notice.

Split the diagram by circuit

Separate power, main, control and indication paths.

60 items · 60 minHands-on · 270 min60 each

Write the work order

Plan layout, conduit, wire pull, termination and inspection.

Turn completion into a checklist

Check dimensions, terminal numbers, connections and required behaviour.