Electrical safety

Organise shock and fire controls as layers

Connect current paths, grounding, interruption and work procedure.

Break down shock conditions

Consider current path, touch voltage, duration and environment.

Separate grounding from interruption

Grounding provides a fault path; protection disconnects power under defined conditions.

120 items · 180 minCombined · about 120 minFloors + practical 60

Verify de-energised work

Disconnect, lock and tag, test for absence of voltage, then discharge or ground where required.

Include heating failures

Relate overload, loose connections and damaged insulation to fire risk.