Construction methods
Map construction order and danger points
Learn earthwork, foundations, concrete and steel by dependency.
Check prerequisites first
Confirm ground, temporary works, materials and workspace before the next process starts.
Read soil and drainage together
Relate excavation depth, soil, groundwater and adjacent structures to support stability.
100 items · 150 minCombined · about 140 minFloors + practical 60
Trace load during frame work
Follow temporary loads through falsework, reinforcement, concrete and steel connections.
Plan dismantling separately
Strength gain, support and nearby work determine a safe removal sequence.